The Fan coil Valve Prefab unit consists of a 3-way ball valve, a 3-way strainer ball valve, a bypass tube, and the designated insulation box. An all-in-One prefabricated unit revolutionizing fan coil unit (FCU) installation.
Benefits
- Prevent any clogging of the control valves and strainers during commissioning and normal operation.
- Avoid time consuming and costly cleaning procedures and repetition of commissioning.
- Simplified Installation Process 100% Factory-Tested for Leak-Free Confidence
- Cost-Effective solution
- Enhanced System Consistence, Reliability & Performance
Feature
- An integrated bypass flushing An integrated bypass tube enables pre-commissioning flushing to avoid possible clogging of PICV and strainer with debris from the pipe installation.
- Simply functional 3-way ball valves regulate the flow during flushing via bypass tube, normal operation toward FCU and shut-off during maintenance.
Integrated Y-strainer traps other possible debris after initial flushing, protecting the PICV from contamination and ensuring consis tent flow control. - Climate specific designed insulation shell Engineering proved one-touch insulation shell is designed for highly humid climate in Southeast Asia ensuring no condensation accumulates on insulation surface. Cutting problems from inconsistent insulation workmanship
- Simplified Installation Prefabricated valve units reduced the connection points by half. Hence, reducing installation time and labor costs. Flexible pipe spacing allows for customization to specific project requirements.
- Optional connection alternative
- Optional connections with male nipple enable direct connection with flexible hoses which further rapid installation with noise & vibration isolation effect.
- Optional downsized connection matches with flow requirement of smaller fan coil units.
- Optional alternative with integrated swivel hanger for easy installation